Maari Work-over

Maari

This was completed over two separate periods to ensure no interruption to their busy Work-over schedule. As with the Mud pumps previously upgraded, the HPU’s received very similar treatment to bring them in line with the appropriate offshore Hazardous location requirements.

 

Maari Hydraulic Power Pack Goughs

 

Maari Workover Unit

 

 

Maari - companies involved

OGST Involvement

As a direct result of the previously successful upgrades to the Mud Pump Power Packs, OMV engaged Gough’s to modify both their remaining Hydraulic Power Packs (HPU’s) to meet Hazardous Location requirements.